Installation and moving of production lines / Factories
Supply and installation of canister bottling line
Bottling line for 3L, 4L and 5L canisters delivered by us to the customer, with installation, setup ...
Installation of pipe production lines, along with ...
First, together with the client, we reviewed all the equipment at the manufacturer’s site, and based...
Moving the furniture factory
Relocation of furniture factory equipment together with a 40 m long paint line. In total, more than ...
Relocation of the wood component finishing line
In the client's old production facility, the entire finishing line was dismantled together with the ...
Berry processing and cleaning line assembly
Installed new berry processing and cleaning line equipment. In addition, various minor remedies were... 