Relocation of the wood component finishing line
In the client's old production facility, the entire finishing line was dismantled together with the associated paint pumps, main switchboard, and other equipment. In the new production facility, the line was installed along with new ventilation piping, selected cables between the main switchboards were replaced, and comprehensive maintenance was carried out, during which the motor bearings and other wear parts were replaced.
The total length of the staining line is approximately 30 meters.